Flush Screed Trunking




The installation of flush screed trunking maximises flexibility and accessibility in a screeded situation. An outlet unit may be installed at any 200mm lid position by breaking out dividing fillets, sliding lid connectors sideways and fitting unit with retaining brackets provided. It is recommended that flush screed trunking should be positioned on a ribbon screed or similar to provide continuous support along whole length of trunking. A self-support system which avoids the need to provide ribbon screed is available on request.

Standard Parts



4 compartment system and alternative depths are available on request.